Offline Partial Discharge (PD) Measurement

Offline Partial Discharge (PD) Measurement

Ensure Electrical Asset Reliability with Offline PD Testing

At Asset Condition Monitoring, we provide specialized Offline Partial Discharge (PD) Measurement Services to assess the insulation health of your medium- and high-voltage equipment. Using IPEC’s industry-leading PD testing technology, our engineers deliver accurate diagnostics that help prevent failures, minimize risks, and extend the life of critical assets.

What is Offline PD Testing?

Offline PD testing is a controlled diagnostic method where electrical equipment is temporarily taken out of service (planned shutdown) and tested under applied voltage stress. This approach eliminates background noise and interference, allowing for highly sensitive detection of partial discharge activity within insulation systems.

Partial Discharge Monitoring Img

Steps in Offline PD Measurement

01

Site Planning & Shutdown


  • Our engineers coordinate with your team to plan the required equipment shutdown.:
  • A safe test setup is established, ensuring minimal disruption to operations.:

02

PD Measurement


  • Using advanced IPEC offline PD testing equipment, we apply voltage to the de-energized asset.:
  • Partial discharge activity is measured across the insulation system, pinpointing weaknesses or defects.:

03

Preliminary Results


  • Immediate insights are shared onsite, enabling quick decision-making and faster return to service.:

04

Detailed Reporting


  • A comprehensive PD test report is issued, highlighting test results, asset condition, and recommended corrective actions.:

Benefits:

  • Noise-Free Results

    Noise-Free Results

    Eliminates interference for more accurate measurement

  • Early Fault Detection

    Early Fault Detection

    Identifies insulation defects before they cause breakdowns

  • Improved Safety

    Improved Safety

    Reduces risk of catastrophic equipment failure

  • Supports Maintenance Planning

    Supports Maintenance Planning

    Informs repair, refurbishment, or replacement strategies

  • Compliance Ready

    Compliance Ready

    Aligns with international standards for electrical asset testing

Why Choose Us?

At Asset Condition Monitoring, we deliver reliable and precise Offline PD Testing services backed by advanced technology and proven expertise. Our team ensures seamless project execution from shutdown planning to reporting

  • circle hook icon Expert CBM engineers with extensive PD diagnostics experience
  • circle hook icon IPEC’s advanced offline PD testing solutions for superior accuracy
  • circle hook icon Support for multiple assets such as cables, switchgear, transformers, and rotating machines
  • circle hook icon End-to-end project support from shutdown planning, testing, and detailed reporting
  • circle hook icon Certified and trusted partner in electrical condition monitoring services
  • circle hook icon Quick turnaround with preliminary onsite results with full reports delivered post-test
  • circle hook icon Flexible onsite service delivery across industrial, utility, and infrastructure sectors
    Get Started Today

    Protect your electrical assets with reliable Offline PD Measurement from Asset Condition Monitoring. Ensure compliance, detect insulation faults early, and reduce the risk of unexpected failures. Schedule your test today and secure long-term performance and safety for your equipment.

    Frequently Asked Questions

    Offline Partial Discharge (PD) testing is performed when electrical equipment is de-energized and connected to a controlled power source. It helps detect insulation defects and weak points before the equipment is put back into service.